| Material: | |
|---|---|
| Color: | |
| Size: | |
| Quality: | |
| Availability: | |
178F Connecting Rod
Huage
Name | Connecting Rod | Place of origin | Fujian.China |
Model | 178F Connecting Rod | Quality | High Quality |
Material | Main raw material aluminum alloy | Features (Applicable) | 178F |
Color | Metallic | MOQ | 10PCS |
Size | Standard size | OEM | Acceptable |
Installation Guide for Air-Cooled Diesel Engine Connecting Rod
Critical: Always consult your engine's service manual first. Ensure the engine is clean and the crankshaft journal is spotless.
1. Preparation: Verify the new connecting rod, bearings, and bolts are the correct specifications. Lubricate the rod bearings and crankshaft journal with clean engine oil.
2. Installation: Carefully position the connecting rod onto the crankshaft journal. Install the rod cap, ensuring its orientation matches the rod (match marks must align). The bearing tangs must seat correctly in their notches.
3. Torquing: Hand-thread the new rod bolts. Using a calibrated torque wrench, tighten them in three progressive stages to the exact specification listed in the manual. Never reuse old bolts. After torquing, the rod should rotate freely without binding.
4. Final Check: Rotate the crankshaft through several full revolutions to confirm smooth, unobstructed movement. Re-check bolt torque after a short initial run-in period.
Warning: Incorrect installation can cause catastrophic engine failure. Proper torque and cleanliness are non-negotiable.

FAQ
Q1: Do you support OEM multi-brand mixed production and separate delivery?
We support multi-brand mixed production and independent separate packaging & delivery for OEM customers.
Q2: What is the safest logistics solution for fragile export products?
Insured air freight or dedicated sea freight with shockproof packaging is the safest solution for fragile products.
Q3: Can you adjust production manpower to speed up order delivery?
We adjust production manpower and equipment allocation dynamically according to order volume to ensure on-time delivery.
Q4: Is product assembly precision included in key pre-shipment inspection items?
Assembly precision, tightness and structural stability are key inspection items for assembled products.
Q5: How do you maintain long-term stable cooperative quality?
Fixed supplier resources, mature processes and strict inspection standards ensure long-term stable cooperative quality.