| Material: | |
|---|---|
| Color: | |
| Size: | |
| Quality: | |
| Availability: | |
170F Connecting Rod
Huage
Name | Connecting Rod | Place of origin | Fujian.China |
Model | 170F Connecting Rod | Quality | High Quality |
Material | Main raw material aluminum alloy | Features (Applicable) | 170F |
Color | Metallic | MOQ | 10PCS |
Size | Standard size | OEM | Acceptable |
Installation Guide for Air-Cooled Diesel Engine Connecting Rod
Critical: Always consult your engine's service manual first. Ensure the engine is clean and the crankshaft journal is spotless.
1. Preparation: Verify the new connecting rod, bearings, and bolts are the correct specifications. Lubricate the rod bearings and crankshaft journal with clean engine oil.
2. Installation: Carefully position the connecting rod onto the crankshaft journal. Install the rod cap, ensuring its orientation matches the rod (match marks must align). The bearing tangs must seat correctly in their notches.
3. Torquing: Hand-thread the new rod bolts. Using a calibrated torque wrench, tighten them in three progressive stages to the exact specification listed in the manual. Never reuse old bolts. After torquing, the rod should rotate freely without binding.
4. Final Check: Rotate the crankshaft through several full revolutions to confirm smooth, unobstructed movement. Re-check bolt torque after a short initial run-in period.
Warning: Incorrect installation can cause catastrophic engine failure. Proper torque and cleanliness are non-negotiable.



FAQ
Q1: Is partial OEM modification and partial ODM innovation order acceptable?
We support mixed orders with partial OEM fixed modification and partial ODM innovative independent design.
Q2: Can you provide logistics cost quotation before order confirmation?
We provide accurate real-time logistics quotations based on order weight, volume and destination for customers’ reference.
Q3: Do you have sufficient production capacity to support large-scale bulk orders?
Our large-scale factory and multiple production lines have sufficient capacity to support super bulk order production.
Q4: Will product accessory completeness be checked before shipment?
We check the completeness of all product accessories, manuals and supporting parts one by one before delivery.
Q5: How do you train QC staff to improve inspection professionalism?
Regular professional skill training and assessment for QC staff improve inspection accuracy and professionalism continuously.