| Material: | |
|---|---|
| Color: | |
| Size: | |
| Quality: | |
| Availability: | |
CRF50 Fuel Tank Switch
Huage
Name | CRF50 Fuel Tank Switch | Place of origin | Fujian.China |
Model | CRF50 Fuel Tank Switch | Quality | High Quality |
Material | Zinc Alloy | Features (Applicable) | XR CRF 50 70 80 100 CRF 150 230 |
Color | As picture | MOQ | 50PCS |
Size | Standard size | OEM | Acceptable |
High‑quality complete fuel tank petcock valve kit built to replace worn‑out or broken stock fuel valves. Every set includes main petcock valve unit, filter pick‑up tube, rubber gaskets and installation screws for one‑step replacement.
Constructed with durable metal valve body paired with premium rubber sealing components, the unit delivers reliable sealing performance to prevent gasoline leakage. The integrated filter tube screens dirt, rust particles and impurities from inside the fuel tank, effectively protecting your carburetor from clogging and premature damage.
Easy direct bolt‑on fit, no cutting, drilling or other modification required. Simply remove the old fuel switch and mount this assembly in original position. Perfect for routine maintenance and motorcycle repair projects. Widely compatible with multiple dirt bike models: CRF50, CRF70, CRF80, CRF100, CRF150, CRF230, XR50, XR70, XR80, XR100.
If your original fuel valve leaks fuel, cannot turn on / shut off fuel normally, this replacement petcock kit is your ideal repair solution.



FAQ
Q1: Is customized OEM processing and ODM design service available?
A: Yes, we integrate OEM processing and ODM independent design to provide one-stop customized services.
Q2: Can I match different shipping methods based on order urgency?
A: Absolutely, you can freely match express, air and sea freight according to your delivery time requirements.
Q3: Can you ensure stable delivery time for repeated customized orders?
A: Yes, we keep a fixed 15-day standard delivery cycle for all repeated orders with stable efficiency.
Q4: Do finished products pass multi-process testing before shipment?
A: Yes, all finished products undergo multi-process repeated testing to reach 100% qualification standard.
Q5: What measures do you take to reduce product defective rate?
A: We adopt standardized operation, real-time process inspection and finished product recheck to minimize defective rate.